A paper published in Hazard Prevention, 19:6, November/December 1983
By Ludwig Benner, Jr. and Robert Sweginnis INTRODUCTION
How would you like to compete in a bowling match where a curtain quickly drops down just in front of the foul line after you deliver your ball down the alley? You never know whether you scored a strike with the first ball, or whether you missed the pins completely. If you don’t find out how you score, what’s the sense of starting the ball rolling? That’s not the kind of game most of us would like to play. We much prefer a game in which we can follow our scores with each roll. [2] Brown, D.B., Systems Analysis and Design for Safety, Prentice Hall, Englewood Cliffs, N.J. 1976 Compelling evidence suggests that, in too many instances, system safety — as currently practiced — has one attribute comparable to bowling behind such a curtain. System safety analyses are prepared, quantified and analyzed with increasing frequency. But, how often is a long-term feedback loop established to convey the “system safety score” achieved by the analyst? THE OPEN LOOP FLAWThe notion of what constitutes a system safety “closed loop” illuminates this problem area. In system theory, a feedback loop is conceived as the information flow from the system output back to the system. This “feedback” is used to change the operation of the system, to correct undesired output.A completed feedback loop is often termed a “closed loop” by system safety specialists. Two widely held views of what constitutes a “closed loop” can be observed in the system safety field. One is the notion that when a safety recommendation to control a hazard is reported to have been implemented, the recommendation file is closed and the safety loop is closed. A second view is that if the design performs as expected during prototype or preproduction or component tests, this information confirms the analysis and closes the loop for the safety analyst. Both views reflect inadequate feedback loops. If we consider the bowling pins as hazards, how many hazard pins did our system safety analysis ball really knock off our workplace alley? What contribution, in the real world, did our system safety analysis efforts make to our team’s score and season record at the alley? Evidence suggests that many system safety practitioners, after providing their safety analyses and opinions, don’t know how the game or the season ended. Furthermore, they may not be looking to find out. Unfortunately, few managers seem to be asking them to do so. What is the evidence supporting these conclusions? Among other things, the evidence includes:
From the accident investigation perspective, a review of 39 accident investigation manuals disclosed that NONE of the manuals required or even suggested that predictive system safety analyses be compared with what occurred. No system safety plan we found required that analyses be tested during accident investigations, or updated by new information from an accident When this has been done during investigations, however, the results have been significant, as will be discussed shortly. Department of Defense MIL-STD-882A clearly illustrates this missing linkage. When one compares 882A and accident investigation manuals used in the Department, one finds that no common model of the accident phenomenon is used. Further, the definitions in the investigation manuals are used in a different context from those in 882A. The bottom line is that accident data and 882A outputs are in different terms, so the two systems do not routinely help each other. The system safety loop must not be considered closed until the predicted safety risks and safety control system performance levels, as determined by system safety analyses, have been validated or upgraded with ongoing system performance information. Did these predictive analyses accurately predict operating disruptions, mishap scenarios and losses resulting from the hazards identified by accident investigators? Was the assessment of safety risk presented to appropriate decision makers during early safety reviews accurate, and is the system now performing as it was originally advertised? Although the vast majority of the information used to validate system safety will be generated after a system is operational, few such direct comparisons are reported in the literature. Prototype and pre-production tests do expose their fair share of dings. bangs and glitches, but what happens after that phase? By “closing” the loop too soon in a system’s life cycle, system safety practitioners cannot determine if their analytical “models’ successfully predicted real world safety and accident performance, or how their models might be upgraded promptly and efficiently to do so. For each mishap after a system is operational, significant questions should be raised by investigators and system safety analysts like:
If you answer these questions "no" in an investigation, your system safety program probably is afflicted with the "open loop flaw."
In the accident at hand, proper methods often disclose potential SYSTEM flaws. But did the investigation discover the SYSTEM SAFETY program’s “open loop” flaw? Has the risk inherent in this “open loop” flaw remained overlooked, unevaluated and uncorrected, and if so how often have accident problems been repeated because the system safety program flaw exists. This open loop has cascading effects on a system’s performance as risks continue to be overlooked, escape evaluation and produce serious consequences. HOW CAN YOU TELL IF YOU HAVE A PROBLEM?The following set of questions can help safety managers and their organization’s senior executives determine if their safety programs contain the "open loop flaw."
IS THIS FLAW WORTH FIXING?The answer is a resounding YES! Closing the loop has been very worthwhile when it has been done. Several examples illustrate the benefits.
We wish we could say these actions stopped accidents for that aircraft. We can’t. Additional losses have occurred. But with each loss, there has been feedback to the system safety analyses and the percentage of unforecasted losses is decreasing. The logistic managers of another older aircraft also took advantage of real world performance feedback to improve their system safety program. The aircraft involved was designed in the late ‘5Os and produced in the ‘60s. The original development program did not include a system safety program. Although the aircraft’s safety record was relatively good, program managers felt that many of the causes of accidents which continued to haunt the Program should be the subject of system safety analyses. Fault trees were developed for the main problem area, the flight control system, and for a secondary problem area, the landing gear. Therefore, maintenance repair and overhaul procedures and critical parts redesign changes were implemented. These fault trees have also proven useful as an accident investigation tool. In a different field, a new design of certain types of railroad cars was subjected to special safety analyses and safety tests during design and prototype development. It passed all tests. After the equipment was put into service, indications of new types of problems arose in accidents. The earlier tests, however, had satisfied the designers. The new information from accident investigations about the adverse safety performance of the cars did not produce a reconsideration of the original safety analyses and tests. Continuing accidents and outside pressures on the industry eventually forced implementation of a safety retrofitting program at a cost estimated to be over $200,000,000. A related issue concerned emergency response actions in the accidents involving these cars. The guidelines for these actions, developed by thoughtful individuals with extensive experience and implemented through the resultant training, were followed faithfully by response officials. The results were disastrous. Numerous responders were fatally or seriously injured. As the toll mounted, the guidelines were reviewed, and with the benefit of re-analysis, were substantially improved. The result no known fatalities or disabling injuries since the old guidelines were changed to incorporate the feedback from good accident investigations, and the improved guidelines were implemented. All the above cases have one common factor. The system safety plan lacked routine updates of the original safety analyses based on accident investigations. In some cases, lives and resources were unnecessarily lost in subsequent accident. One of the problems that surfaces when this is attempted is the incompatibility between predictive safety analysis methods and the methods needed to investigate and analyze accidents. Fault tree methods dominate the former activity, while other events sequencing methods dominate the latter. Fault tree has been found to have narrow applications in accident investigations, and advanced investigative analysis methods have not been widely tried for predictive analyses. Compatible methods will be needed in the interests of efficiency if for no other reason. WHAT SHOULD BE DONE?The examples suggest several specific actions by the system safety community. These actions affect changes to safety program requirements and to system safety analysis and accident investigation practices. The first step that must be taken is to acknowledge that the open loop flaw” exists and merits action.Other steps that should then be taken include:
ABOUT THE AUTHORS:Ludwig Benner Jr. is an adjunct faculty member and Field Instructor for the University of Southern California’s Institute of Safety and Systems Management. He was with the National Transportation Safety Board, as Chief of its Hazardous Materials Division. He directed numerous accident investigations, studies, evaluations of safeguards and procedures in hazardous materials transportation safety. He received his Chemical Engineering degree from Carnegie Institute of Technology. He is a registered Professional Safety Engineer. He has testified on safety matters before the U.S. Congress, and served on two Virginia Legislative Study Commissions, National Academy of Sciences committees and panels, and on several Federal agency safety projects and advisory groups. He is a Fellow of the System Safety Society.Robert W. Sweginnis is a Field Instructor in Aviation Safety for the Institute of Safety and Systems Management, Extension and In-Service Programs Office, University of Southern California. His previous experience includes Technical Assistance Coordinator, Directorate of Aerospace Safety, Air Force Inspection and Safety Center; Chief, Developing Systems Branch, Systems Safety Division, Air Force Inspection and Safety Center, and Senior System Safety Engineer in the A-1O program; plus 8 years as a full-time USAF safety officer, including service on 10 mishap investigation boards. He received his B.S. in Aeronautical Engineering at New York University, was awarded an MS. in Engineering Administration from Southern Methodist University. He has engaged in additional studies in System Safety Engineering and Aircraft Crash Survival. He is chapter secretary for the American Society of Safety Engineers, and a member of the System Safety Society, and the International Society of Air Safety Investigators. Mr. Sweginnis is a registered Professional Safety Engineer in the State of California, and a Certified Safety Professional (Engineering). [1] U.S. Department of Defense, “Military Standard System Safety Program Requirements,” MIL-STD-882A, June 28, 1977 [3] Hammer, W., Product Safety Management and Engineering, Prentice Hall, Englewood Cliffs, N.J. 1980. [4] Vesley, W.E. et al, Fault Tree Handbook, NUREG 0492, U.S. Nuclear Regulatory Commission, Washington, D.C. 1981. [5] Malasky, S., System Safety: Technology and Application, Garland STPM Press, New York 1982. [6] Clemens, P.L., A Compendium of Hazard Identification & Evaluation Techniques for System Safety Application, Sverdrup Technology, Inc., AEDC Group, Arnold Air Force Station, TN 1981. [7] Roland, H.E. and Moriarty, B., System Safety Engineering and Management. John Wiley, New York, 1983 |